We are creators of trusted spaces with safe climate management. We seek to provide the greatest comfort to all our clients so that they can function normally and carry out their daily activities. Our commitment is to carry out our work in an intelligent and efficient way, optimizing the thermal comfort of spaces, ensuring air quality in closed places, extending the useful life of the facilities, reducing resource consumption through the use of new technologies and configurations. of equipment and reconditioning systems to create financial benefits for our clients and the planet, seeking to be part of a sustainable future.

As pioneers in our country, we have managed to establish air conditioning systems, seeking to be the transformers and collaborators to create, maintain and care for the climate of our society, looking for new and better ways to do it day by day.

Years of Experience
0
Employees
0
Installed tons
0
tons of
Technical service
0

Our projects

Through engineering development, we carry out projects tailored to your needs.

Our Clients

We create highly efficient air-conditioned spaces based on economies of scale to reduce high energy consumption and peaks within electrical transmission networks, reduce the carbon footprint by contributing to the reduction of greenhouse gas emissions and reducing the consumption of water.

Our Allies

Do you need air conditioning solutions?

We have multiple solutions that are tailored to the needs of your business.

Los Libertadores University Foundation

Cartagena Colombia

Construction of the air conditioning system for the new headquarters project in Cartagena of the LOS LIBERTADORES UNIVERSITY FOUNDATION.

Change of PVC (horizontal) condensation pipes, condensing units and installation of PN20 polypropylene pipes and accessories, installation of bypass chiller for air conditioning.

Northern University Foundation - Multipurpose Building

Barranquilla, Colombia

The supply, installation and commissioning of the air conditioning system of the Multipurpose Building of the Universidad del Norte was developed. The scope also includes balancing, testing and commissioning of equipment: handling units, chilled water fan and coil units, mini split chiller units, heat recovery chiller units, variable volume boxes, air blower units and air centrifugal.

A 550-ton York centrifugal chiller with two Reymsa model 300 towers.

Amstrong cold water pumps primary system of 25 hp (horsepower), Amstrong cold water pumps secondary system of 75 hp, condensation water pumps (towers) of 30 hp.

Pontifical Javeriana University – Attic Building

Bogota Colombia

In the project, a main air conditioning system was installed, cooled by water, through two chillers, as well as, in conjunction with two towers and 17 air handlers. The balancing of air conditioning equipment located in the attic building was developed. On the other hand, a mechanical ventilation system was installed for the bathroom battery.

Outlet Factory Shopping Center

Bogota Colombia

Supply and installation of mechanical ventilation systems and infrastructure for air conditioning.

This system would be made up of:

  • Cooling towers made of fiberglass.
  • Fans.
  • Armastrong brand condensation water pumps.
  • Speed ​​Variators.
  • Air filters.
  • Condensation water networks.
  • Hermetic doors.
  • Passage valves with threaded bronze or flanged union depending on the pipe.
  • Supply of boards in the equipment that requires it.
  • Galvanized sheet ducts.
  • Diffusers and grilles.
  • Flexible pipes.
  • Adjustment and balancing.

Panama Tower Building

Lima Peru

Implementation of a building air conditioning system based on the production of cold water through water-condensed Chillers, Cooling Towers and with internal distribution through fan coil for common areas.

Mechanical Ventilation, Pressurization of Stairs, Monoxide Extraction, etc.

WeWork

Lima Peru

Implementation of a coworking office air conditioning system, using chilled water fan coil, VRF equipment and mechanical ventilation.

Implementation of an automated control system for easy use and monitoring of air conditioning equipment.

Claro Business Tower

Bogota Colombia

The project includes: Shopping center with two levels, four (4) basements and four towers from floors 3 to 10.

To supply the thermal load required for the business center and towers 1 and 2 from levels 3 to 10, three (3) 538 tr magnetic-type water-condensing water chiller units were installed.

The shopping center has 33.475 square meters, tower 1: 2.013 square meters and the tower: 1.850 square meters. The system used in the cold plant is of the variable primary pumping type.

For towers 1 and 2, a variable speed secondary pumping system is used. For the business center and levels 1 and 2, variable speed drive units will be used for the offices. For the extraction of food odors from level 2 of the business center, four (4) smoke extraction and odor eliminator systems will be implemented, with a capacity of 22.000 cfm each.

For towers 3 and 4, from floors 3 to 10, two (2) cooling towers of 350 tr each will be used, with variable speed in the pumps and towers. For each zone, the end user will place their respective package type unit with water condensation.

Puerta de Oro Events and Convention Center

Barranquilla, Colombia

Supply and installation of 3 centrifugal chillers of 55o tr each and two screw chillers of 220 tr and one of 110 tr to condition the fairgrounds and support areas, the system consists of a variable primary and secondary system, the handling units were located on a technical slab with noise eliminators in the supply and return ducts, the supply ducts are circular and through imported nozzles they supply air from the ceiling to the lower part of the 16-meter-high exhibition center, the units are condensed by water for which 8 cooling towers were used. In total the system consists of 6 handlers.

Caribe Plaza Shopping Center

Cartagena Colombia

The work consists of the supply and assembly of the mechanical ventilation and air conditioning system.

El Cacique Shopping Center

Bucaramanga – Colombia

The supply and installation of air conditioning for the Cacique Mall and the infrastructure for the commercial premises were developed, cooling, vertical pumps with variable speed duct system, polybutene pipes, ventilation system, two condensate water treatment systems, supervision and engineering and a control system for the entire plant with optimization of energy consumption.

Supply and installation of two cooling towers with their pumps and pipes.

Hotel Karibana

Cartagena Colombia

An air conditioning and mechanical ventilation system was implemented in Tower 2 Building, STAGE III and the building ventilation supplies 48.899 cfm of outside air, having 4 DOAS systems as follows:

  • Two systems of 13262 cfm and 12860 cfm for floors 2 through 6 and the first floor bedroom area.
  • A 10447 cfm system for the first floor.
  • A 5409 cfm system for the basement.
  • A 6921 System for the Ball Room.

 

To carry out energy recovery, bath extraction is carried out directly by the extraction fans incorporated into the energy recovery units, with no additional extraction equipment required.

Supply, import, nationalization, transportation, assembly, installation, start-up and correct operating status of the equipment that makes up the cogeneration system of electrical, solar and thermal energy.

Dann Carlton Hotel & Convention Center

Barranquilla, Colombia

Supply, installation and commissioning of the air conditioning system. The project consists of the installation of two centrifuges of 300 tons each, a cooling tower on the third floor of the hotel. As a result, there is a saving in energy consumption of more than 40%.

Zuana Hotel

Santa marta colombia

The work consists of the supply and assembly of the mechanical ventilation and air conditioning system. 35.900M2 1000 TR chiller screws 330 rooms, event rooms, restaurants and gym.

Hotel Las Americas

Cartagena Colombia

The supply, installation and commissioning of the air conditioning and mechanical ventilation systems in the Torre del Mar and expansion of the Hotel Las Americas convention center were carried out.

33.351 M2 800 TR chiller screws, 279 rooms, 4 restaurants, 4 bars, 1 gym, food center.

Hotel Hilton Garden Inn

Barranquilla, Colombia

WWTP Wastewater Treatment Plant

Cooling and ventilation system consisting of a water chiller with a capacity of 200 tr, capacity = 700 to lower the water temperature of the buildings of: operations, preliminary treatment, inlet pumping station, thickening and dewatering, ventilation system in tower A, BYC of the digesters, energy recovery, maintenance, truck workshop, truck washing, blowers, primary and return sludge pumping station, Electrical substation of the Secondary Sedimentation areas, among others. The system includes a network of pipes to supply water to each building and the water pumping system.

ZF-Tower

Bogota Colombia

Air conditioning system consisting of a cold water plant (4 chillers) with 120 tons of refrigeration. Vertical in-line type cold water circulation pumps. Complete handling units, centrifugal fan units for basement extraction, bathroom extraction, pressurization of stairs using mushroom fans and pent house. Central system control and monitoring system. It has BTU measurement systems for each point on the network.

Amarey Nova Medical Group

Bogota Colombia

Farmacapsulas SA

Barranquilla, Colombia

Mormon Temple

Arequipa, Peru

Implementation of the temple's air conditioning system based on the production of cold water through air-condensed Chillers and with internal distribution through handling units, fan coils, vav boxes.

For the administrative area (Shelter), VRF equipment with cassette-type indoor units was available.

Mechanic ventilation.

Falabella Saga – Mall Plaza

Lima Peru

Implementation of the store's air conditioning system based on the production of cold water through air-condensed Chillers and with internal distribution through handling units, fan coils.

For the administrative area, VRF equipment was available with indoor fan coil and cassette units.

Mechanical ventilation, pressurization of stairs.

Implementation of an automated control system (BMS) for the easy use and monitoring of air conditioning, electrical, sanitary and fire detection equipment.

FOSUNAB Foundation Health Complex

Bucaramanga – Colombia

In the work, the supply and installation of the air conditioning system for the FOSUNAB FOUNDATION health complex was developed, which is composed of three centrifugal chillers of 800 TR each, three cooling towers, vertical pumps with speed chillers, ducts, steel pipe, cold water handlers with filtration ranging from 35% to 99.97% and fan coil for rooms, energy recovery systems, precision units for UPS ventilation, supervision and engineering system and a control system for the entire plant with optimization of energy consumption.

Likewise, a basement extraction system, office building equipped with cooling towers and water-condensed packages with their pumps and cooling towers.

47.000 square meters built. It has 400 beds, a convention center for 1500 people and a hotel for 40 suites.

Ibero-American Clinic

Barranquilla, Colombia

Supply and installation of air conditioning and mechanical ventilation. The system is made up of water chiller units, francoil units, handlers, cooling towers, fans, cold water and condensation pumps and networks, ducts, supply grids, extraction hoods, mini-split units and the respective control panels.

19.657 square meters built. It has 95 beds.

Porto Azul Auna Clinic

Barranquilla, Colombia

Within the work, the supply and installation of the air conditioning system of the Porto Azul clinic was carried out, which is composed of two 380 TR centrifugal chillers, two cooling towers, vertical pumps with variable speed drives, duct system, steel, 68 cold water handlers with filtration ranging from 35% to 99.97% and 140 fan coils for rooms, two energy recovery systems, 10 precision units for UPS ventilation, supervision and engineering system and a control system for the entire plant with optimization of energy consumption.

15.900 square meters of clinic. It has 112 beds and 164 offices.

EsSalud Barton Thompson Hospital

Lima Peru

Daniel Alcides Carrión Regional Hospital

Cerro de Pasco – Peru

Implementation of an air conditioning system based on the production of hot water through water heaters and with internal distribution through air handling units, VAV boxes and fan coils.

Serena del Mar Hospital Center

Cartagena Colombia

The District distributes thermal energy to the buildings that make up this commercial and residential complex, including the Serena del Mar Hospital Center.

Serena del Mar Residential

Cartagena Colombia

CAVANA Residential Project.

  • – Replacement of conventional mini Split systems.
  • – Expansion of the existing Thermal District core.

Potenza Business and Business Center Thermal District

Villavicencio – Colombia

Intramural Thermal District that will supply the necessary energy (in Btu/h) to supply the cooling capacity of the offices and equipment in common areas; This District will deliver the energy through Agua Helada.

Two office towers – Thermal/energy district that supplies electricity and air conditioning.

Four Seasons Hotel and Private Residences

Cartagena Colombia

Intramural thermal district with a cooling capacity of 550 tons. trigeneration district with the components of electrical generation, chilled water, sea water for condensation system, hot water for consumption of the Real Estate Project and for Re-Heat of the air conditioning system.

Big Apple Thermal District

Cartagena Colombia

Intramural thermal district with a capacity of 550 tons of cooling, through which energy consumption by the premises and common areas will be reduced by the generation of cold water for the air conditioning system, which will reduce the use of refrigerant gases

Karibana Hotel

An air conditioning and mechanical ventilation system was implemented in Tower 2 Building, STAGE III and the building ventilation supplies 48.899 cfm of outside air, having 4 DOAS systems as follows:

To carry out energy recovery, bath extraction is carried out directly by the extraction fans incorporated into the energy recovery units, with no additional extraction equipment required.

Supply, import, nationalization, transportation, assembly, installation, start-up and correct state of operation of the equipment that makes up the Co-generation System of electrical, solar and thermal energy.

Serena del Mar Thermal District

Cartagena Colombia

Mixed-use extramural thermal district, with a cooling capacity of 1,544 tons, which air-conditions a hospital, a university and housing projects that are under development.

Lo Nuestro Thermal District

Monteria – Colombia

This shopping center has a solar system and an intramural thermal district with a cooling capacity of 1,410 tons, which benefits 157 commercial premises with an optimal temperature in their spaces.

Its function is the production and distribution of chilled water to the customer's connection point and with internal distribution to 156 subcustomers (commercial users).

It currently has an installed capacity of 1410 TR-hour and consists of two electric chillers and one absorption chiller.

La Alpujarra Thermal District

EPM Medellin – Colombia

This institutional type project has an installed capacity of 3.600 TR-hour, providing cooling to different public buildings in the city of Medellín: Antioquia Governorate, Medellín Municipality Building and Dian Building, Antioquia section.

Using a gas-based water cooling system, it is distributed through underground pipes, replacing the traditional air conditioning system, in the public buildings of the La Alpujarra complex.